King Fabrication
King Fabrication · Mechanical Ventilation

Mechanical Ventilation Systems, Designed & Installed for Sydney Commercial Buildings.

AS 1668.1 & 1668.2 compliant supply, exhaust and make-up air systems for warehouses, factories, fit-outs and commercial kitchens. Engineered in-house, installed by our own Sydney crew — never subcontracted.

AS 1668.1 & AS 1668.2 compliant
Engineered + installed in Sydney
In-house fabrication + install crew
20+ years in HVAC across NSW
Call 0405 106 128 5.0★ Rated on Google

Get a Mechanical Ventilation Quote

Site survey within 48 hours. Detailed quote within 2 business days of survey.

No spam. We only contact you about this request.

Why King Fabrication

Engineered properly. Installed properly. Signed off properly.

AS/NZS 1668 Compliant

Every system designed and certified against AS 1668.1 (fire & smoke control) and AS 1668.2 (mechanical ventilation acceptable indoor air quality). Compliance documentation issued on commissioning.

Engineered Ductwork

Custom rectangular and round galvanised / stainless ductwork fabricated in our Sydney workshop. Sealed seams, accessible service panels, balanced for design airflow.

Sydney Install Crew

Our own licensed mechanical install team — never subcontracted. Single point of contact from first site visit to commissioning sign-off.

Designed to Last 20+ Years

Quality fans, dampers, and grilles specified to commercial-duty cycles. The system we hand over is the one you keep running for two decades.

What the standard asks for

Mechanical ventilation, and why systems fail certification.

AS 1668.1 and 1668.2 do different jobs

They get quoted together so often that they are frequently assumed to be one requirement. They are not, and a system can satisfy one while failing the other.

  • AS 1668.1 covers the use of ventilation air handling in fire — smoke control, smoke spill, stair pressurisation, and how the system must behave when the alarm goes off.
  • AS 1668.2 covers ventilation for acceptable indoor air quality in normal operation — outdoor air rates, exhaust from wet areas and car parks, and general occupancy ventilation.

A fit-out that meets its outdoor air rates but has no correct fire mode, or dampers that do not fail to the right position, will not certify. The time to find that out is at design stage, not at the inspection.

Rates come from use-class and occupancy

Required outdoor air is driven by what the space is used for and how many people are in it, not by floor area alone. An office, a gym, a commercial kitchen and a car park in the same building envelope have very different requirements.

This is the single most common reason a change of use trips people up. Taking a tenancy that was previously retail and turning it into a gym or a food premises can change the ventilation requirement substantially, and the existing system may be nowhere near it.

If you are fitting out an existing tenancy, tell us the intended use at survey. We will tell you early whether the existing system can be rebalanced to suit or whether it needs capacity it does not have — which is far cheaper to know before the lease is signed.

Car parks, plant rooms and the awkward spaces

Enclosed car parks carry their own ventilation requirements driven by contaminant control, and they are frequently the part of a building where the mechanical services are in the worst condition — fans that have not run in years, dampers seized open, and controls that were never commissioned.

Plant rooms, switch rooms and store rooms each have their own ventilation and heat rejection requirements, and they tend to be the spaces that get squeezed when a floor plan changes late in design.

We survey these as part of scoping a building rather than pricing only the visible occupied space, because they are the items most likely to become a variation later.

Commissioning is where the value is

A mechanical ventilation system is not finished when it is installed. It is finished when it has been balanced so each outlet delivers its design airflow, the fire mode has been proven, and the results are documented.

Systems handed over without commissioning data are the ones that come back — rooms that never feel right, extraction that will not pull, and no baseline to diagnose against when something changes.

We test and balance before sign-off and hand over the measured figures, so you have documentation for your certifier and a reference point for whoever maintains the system afterwards.

Specification

What we design and build to.

Standards
AS 1668.1 fire mode and smoke control, AS 1668.2 indoor air quality, AS 4254 ductwork, and the National Construction Code.
Building types
Commercial fit-outs, factories, warehouses, workshops, commercial kitchens, and enclosed car parks.
Scope
Supply air, exhaust extraction, make-up air, and replacement or upgrade of existing systems.
Ductwork
Custom rectangular and round galvanised or stainless duct, fabricated in our Smeaton Grange workshop.
Plant
Fans, dampers and grilles specified to commercial-duty cycles rather than the cheapest item that meets the number.
Commissioning
Tested and balanced to design airflow before sign-off, with measured data handed over.
Documentation
Compliance documentation formatted to suit a private certifier or council.
Site survey
Within 48 hours of contact. Detailed quote within 2 business days of the survey.
How it runs

From survey to commissioning sign-off.

1

Site survey, within 48 hours

We look at the whole building — occupied space, plant rooms, car park, existing plant — and confirm the intended use-class before anything is priced.

2

Design and quote

Rates calculated against use-class and occupancy, fire mode resolved at design stage, and a detailed quote within 2 business days of the survey.

3

Shop drawings

Supplied ahead of fabrication for your builder, certifier or architect to work to.

4

Fabrication

Ductwork made in our own workshop to survey dimensions, so retrofit routes get the pieces they actually need.

5

Install, balance, document

Our crew installs, balances every outlet to design airflow, proves the fire mode, and hands over the commissioning data.

Reviews

What customers say on Google.

5.0 out of 5 from 5 Google reviews.

Mina and the boys have been a pleasure to work with. They've helped us install a new extraction system for our printers and their commitment to getting the job right and persevering through challenges is outstanding. 100% recommend.

James PetersenGoogle review

Mina's team is amazing best service I had

MaryaGoogle review

Mina and the team did a great job. Super happy with their services!

Steven NakhlaGoogle review

Good Job Mina.

Osama HamdanGoogle review
FAQ

Common questions

What jobs do you typically take on?

Commercial fit-outs, factory and warehouse ventilation, commercial kitchen mechanical ventilation, industrial extraction, and replacement / upgrade of existing systems. Both new-build and retrofit.

How fast can you get on site?

Site survey usually within 48 hours of you reaching out. Detailed mechanical ventilation quote within 2 business days of the survey.

Do you handle the BCA / Section J compliance paperwork?

Yes. We issue AS 1668.1 and AS 1668.2 compliance certificates on commissioning, signed by our licensed mechanical engineer. Compliance reports formatted to suit private certifier or council requirements.

We're changing the use of a tenancy — will the existing system still comply?

Often not. Required outdoor air is driven by use-class and occupancy, so going from retail to a gym or a food premises can change the requirement substantially. Tell us the intended use at survey and we will tell you before you commit whether the existing system can be rebalanced or needs more capacity.

Can you design as well as install?

Yes. We design the full mechanical ventilation system to suit your space, use-class, and occupancy — including duct routing, fan sizing, and grille selection. We can supply shop drawings ahead of fabrication if your builder needs them.

What's the typical lead time?

From quote acceptance to a commissioned mechanical ventilation system: 4–10 weeks depending on building size and complexity. Smaller upgrades and fan replacements can be much faster.

Do you service existing mechanical ventilation systems?

Yes — service, repair, and upgrade of existing systems across Sydney including fan replacement, ductwork repairs, sensor recalibration, and balancing.

Get your mechanical ventilation quote.

Two business days from first call to detailed quote. Call us or fill the form — same response either way.

Call 0405 106 128
📞 Call Now Get Quote