AS/NZS-compliant canopies, ducting and make-up air systems. Site survey within 48 hours, fabrication in our own Sydney workshop, fitted by our crew — not subcontracted.
Every system designed and signed off against AS 1668.2, AS 5601 and the BCA. Compliance certificates issued on commissioning.
No third-party shops. Your canopies and ducting are CNC-cut and welded in our Sydney workshop. Faster lead times, tighter QA.
Our own licensed install team — no subbies. One point of contact from quote to commissioning.
304/316 stainless construction, fully-welded seams, accessible access panels. The system you install is the one you keep.
Site survey usually within 48 hours of you reaching out. Detailed quote within 2 business days of the survey.
Yes. We issue AS/NZS 1668.2 and AS 5601 compliance certificates on commissioning, signed by our licensed mechanical engineer. Council inspections typically pass first time.
Absolutely. We work alongside builders, fit-out crews and architects regularly. We can supply shop drawings ahead of fabrication if your team needs them for sign-off.
From quote acceptance to commissioned system: 4–8 weeks depending on complexity. Standalone canopy swaps can be much faster.
Yes — clean, repair and service of existing exhaust systems including fan replacement, duct cleaning, and access-panel retrofits.
Two business days from first call to detailed quote. Call us or fill the form — same response.
Call (02) 9119 8800