End-to-end ventilation builds for commercial kitchens, factories, warehouses and workshops. We design, fabricate and install the whole system — and certify it on commissioning.
No three-way blame games. We design the ventilation system, fabricate the ductwork, and install it. One point of accountability.
AS 1668.2 (mechanical ventilation), AS 4254 (ductwork), Section J energy compliance. Certificates issued on commissioning.
Every system is air-flow tested and balanced before sign-off. We hand you commissioning data, not just a handshake.
Custom spiral and rectangular duct fabricated in our Sydney shop — faster than ordering pre-made. Custom shapes welcome.
Most commercial jobs use a mix, and choosing between them is a trade-off between space and performance rather than a matter of preference.
Because we fabricate rather than order in, we can make the transition pieces the job actually needs instead of forcing the route to suit stock fittings. On retrofits into existing buildings, that is usually the difference between a clean install and a compromised one.
Duct leakage is the most common reason a system moves less air than it was designed to. It shows up as rooms that never reach temperature, extraction that will not pull, and fans running harder and louder than they should to compensate.
Leakage is cumulative and invisible. A run with many poorly sealed joints can lose a substantial share of its airflow before it reaches the outlet, and no amount of fan capacity fixes it economically — you are just paying to push air into a ceiling void for the life of the building.
We seal to the duct class the system is designed for, and we test and balance before handover so you get measured airflow figures rather than an assurance that it should be fine.
Ductwork carrying conditioned air through unconditioned space has to be insulated to meet the energy provisions of the National Construction Code. Getting this wrong is both an energy cost and a certification problem that surfaces late, when it is expensive to fix.
Duct in a hot roof space is the usual trouble spot. It is also where condensation forms if the vapour barrier is not continuous — which shows up months later as stained ceiling tiles that get blamed on the roof.
We specify insulation and vapour barrier as part of the build rather than leaving it to be sorted on site, and we account for it in the space allowance at design stage so the duct still fits once it is lagged.
Replacing or extending ductwork in a building that is still trading is a different job from a new fit-out, and most of the difficulty is programme rather than fabrication.
We fabricate to survey measurements taken on site, which is why we scope in person rather than quoting from a drawing set for retrofit work.
We measure what is actually there, work out the route, and identify the awkward parts before they become variations. Free, and usually within 48 hours.
Itemised by fabrication and install so you can see where the cost sits.
Supplied to your builder, certifier or head contractor in their format, including RFIs and progress claims where the contract needs them.
Made to survey dimensions in our own workshop. Custom transitions and shapes are normal work, not an exception.
Our crew installs, then tests and balances the system and hands over the commissioning data.
5.0 out of 5 from 5 Google reviews.
Mina and the boys have been a pleasure to work with. They've helped us install a new extraction system for our printers and their commitment to getting the job right and persevering through challenges is outstanding. 100% recommend.
Mina and the team did a great job. Super happy with their services!
Good Job Mina.
They do very good and reliable jobs
We can handle the design ourselves for most commercial systems. For specialised cleanroom or pharma applications we partner with a mechanical engineer at no extra cost to you.
Standard commercial fitouts: 4–8 weeks from quote acceptance. Urgent works can be expedited — get in touch and we'll tell you straight up.
Constantly. We slot into D&C and traditional contracts. We supply shop drawings, RFIs and progress claims to your format.
Yes — that is the advantage of fabricating rather than ordering in. If the route needs a piece that does not exist as a stock fitting, we make it to the site measurements.
Regularly. We prefabricate as much as possible off site and stage the work so the building is usable at the end of each shift. Tell us your operating hours at scope stage.
12-month workmanship warranty on all installs. Ductwork itself carries the manufacturer's material warranty (typically 10+ years).
Yes. Current insurance certificates are supplied on request before site mobilisation, in whatever format your head contractor or building manager needs.
24-hour quote turnaround. Free on-site scope visit.
Call 0405 106 128We use cookies to understand how this site is used and to improve it. Privacy policy